Transportation facility - Extensive vertical transportation systems were provided including numerous travelators complete with automatic energy conservation facilities that provided multi level access for incoming and outgoing shoppers and trolleys.
Extensive vertical facilities were provided in the form of large industrial type lifts and general passenger/disabled access facilities.
The fire fighting facilities included full wet and dry fire fighting system.
Dunnes Stores Retail Development, Multi-Storey Carpark, Navan This retail development consists of a
Multi-storey car park,
Lighting
General services
Emergency lighting
Fire detection
Alarm facilities and CCTV
Car park access and control systems
MV substation and distribution
Retail Units & Multi Storey Car Park, Apartments And Town Houses, Drogheda Full Mechanical and Electrical services including
Low pressure hot water
General water distribution
Fire hose reels and fire fighting facilities
General ventilation and smoke ventilation
Centralised metering facilities
Commercial/retail electrical installations
Multi storey car park
Lighting
General services
Fire detection systems
Full vertical transportation systems in the form of duplex lifts were provided
Shopping Centre & Retail Units, Roscommon A complete Electrical & Mechanical installation was provided for this application.
This included sub station facilities, Centralised metering, Power distribution
Lighting, Emergency lighting, CCTV, Fire detection systemsMains water distribution, Centralised boiler plant, Low pressure hot water installation, Air handling distribution system, Extensive plumbing and, external fire fighting facilities were also provided
Shopping Mall & Retail Centre, Carlow This facility is currently being designed and developed. We are performing energy calculations and simulations utilising dynamic computerised facilities to assist in determining the response of the building to the outdoor ambient influences, whilst taking account of the varying occupancy during high peak and low peak usage.
The principle of the design is to achieve a high level of energy conservation utilising sustainable principles for both Mechanical and Electrical applications.
Further consideration will be given to the application of geothermal heat pumps and combined heat and power generating equipment.
Incorporating corporate anchor tenants, local tenant facilities with mezzanine, double level underground car parking. Above ground Podium mounted multi-storey residential towers
5MW medium low voltage and high tension distribution system.
Integrated radiant heating and natural ventilation system
Double basement car park incorporating automatic dispersement, smoke ventilation with contamination control and priority selection.
Automatic sequence fire smoke ventilation systems
Full sprinkler system with underground storage and pumping facilities
Wet riser fire fighting facilities throughout installation
Full Mechanical and Electrical services for residential/apartments